Click to Home

Go To Search
Solar System Streamlined Permitting
Solar System Streamlined Permitting

The City of El Cerrito’s Planning and Building Division has implemented a streamlined review, permitting, and inspection process for up to 10 kW photovoltaic and up to 30 kWth solar thermal residential systems. 

To qualify for the streamlined process for solar systems, an Eligibility Checklist and a Structural Criteria Checklist with supporting documents, roof layout drawings, plumbing or electrical schematics, and permit application must be submitted. If any checklist items are checked “NO”, the application will be returned for revision to fit within the Eligibility Checklist. Otherwise, the permit application shall be required to go through the standard review, permitting, and inspection process.

Eligibility Checklist for Expedited Solar Photovoltaic Permitting for One and Two Family Dwellings

Eligibility Checklist for Expedited Solar Pool Heating Permitting for One and Two Family Dwellings

Structural Criteria for Residential Rooftop Solar Energy Installations

Eligibility Checklist for Expedited Solar Domestic Water Heating Permitting for One and Two Family Dwellings

 

 

 


 

 



FacebookTwitter