Street Paving Schedule Overview
The City has inspected all local streets to determine what type of work is needed as well as to help prioritize the order in which streets will be repaired. With Measure A funding, during 2008, crews will fix potholes, repair localized pavement failures and install curb ramps where needed. Then, during 2009-2011, crews will resurface those streets.
See the Street Paving Maps for more details about work planned in 2009.
Note: 2011 is the end of the accelerated program.
After completion of the accelerated work plan, future years’ work will be devoted to ongoing maintenance. In addition, a portion of Measure A revenues will be used to improve non-vehicular mobility and accessibility (such as curb ramps, and bicycle and pedestrian safety improvements) as well as to resolve significant street drainage problems. |
|
|
|
|||||
|
10890 San Pablo Avenue, El Cerrito, CA 94530-2323 Tel 510 215-4300 Fax 510 215-4319 E-Mail comments@ci.el-cerrito.ca.us copyright © 2000 2010 all rights reserved
|
|||||