ARCHIVED CIP Projects

2015 Slurry Seal and Curb Ramp Program

Link to page

STREET IMPROVEMENT PROGRAM

Link to page

Arlington Blvd Safety Improvements Project

Information about the Arlington Blvd at Madera and Brewster Drives Safety Improvements Project.

Link to page

I-80/Central Ave Interchange Improvements

Information about interchange alternatives to improve traffic flow.

Link to page

Central and Liberty Street Improvements

Information about improvements planned along Central Avenue between San Pablo Avenue, the Ohlone Greenway, and Liberty Street between Fairmount Avenue and Central Avenue.

Link to page

Richmond-Ohlone Greenway Project

Information about the Richmond-Ohlone Greenway Closure Project which seeks to provide a continuous bicycle and pedestrian pathway.

Link to page

Ohlone Greenway Natural Area and Rain Garden Project

Link to page

Potrero Ave Safety Improvements Project

Information about the Potrero Ave between 55th and 56th Safety Improvements Project.

Link to page

Moeser-Ashbury Safety Improvements

Moeser Lane and Ashbury Avenue Pedestrian and Bicycle Corridor Improvements information.

Link to page

2014 Pavement Rehabilitation Project

Information on the City of El Cerrito's Pavement Rehabilitation Project

Link to page

Castro Park Field Renovation

Information on the renovation of the athletic field at Castro Park (Norvell Ave).

Link to page

Arlington and Brewster Curve Safety Improvements

Arlington Boulevard and Brewster Drive Curve Safety Improvements Project, City Project No. C3071.

Link to page

2016 Microsurfacing and Curb Ramp Program

The scope of work includes installation of curb ramps, repair of localized pavement failures, sealing of cracks, application of a full street width microsurfacing treatment, and installation of the traffic striping and markings.

Link to page

2021 sidewalk repair project, c3024.6

This project will rehabilitate the sidewalks including curb, gutter, and drainage piping that have been damaged by the roots of street trees at six (6) sites along San Pablo Avenue. 

Link to page

GLADYS AVENUE, EL DORADO STREET, B STREET IMPROVEMENT PROJECT 

The project will rehabilitate the roadway pavement, reconstruct sections of sidewalk, curb, and gutter damaged by street trees, reconstruct storm drain facilities, install new and modified curb ramps, and install enhanced traffic signing and pavement markings. 

Link to page

2021 SLURRY SEAL PROJECT

Link to page

CARLSON BOULEVARD & SAN DIEGO STREET PEDESTRIAN CROSSING IMPROVEMENT

Contact Project Manager